e-Claire

A Post Millennial Consideration of Our Interconnection
by a simple tootsie from The Country™...




If comments are closed, please email me: Claire AT e-biscuit DOT com




MAIN PAGE HERE





Dept. of Secret Messages

Quote meon an estimate et non interruptus stadium. Sic tempus fugit esperanto hiccup estrogen. Glorious baklava cheesecake ex librus hup hey yo ho ho ad infinitum. Non sequitur as usual, condominium facile et geranium incognito. Hoo-Ah! Betcha didn't know that!

Stuff by the Month

Most Recent Stuff

Syndicate

This page has been viewed 3060467 times

Referrers

Powered by ExpressionEngine

Not as Sexy as Bombs and Body Parts

so not suitable for MSM… maybe even not ‘actual nooz’...

image

BAGHDAD, Iraq – More than 31,000 Iraqi citizens in the Ninewa and Basrah Governorates are expected to benefit from

from the construction of four potable water projects. These compact potable water treatment plants and the installation of deep wells, pumps and distribution networks in Ninewa and Basrah were identified by Provincial Regional Development Committees and local authorities in conjunction with the Ministry of Municipality and Public Works.

Three projects to construct, pumps, and distribution networks will supply potable water to about 25,000 residents throughout Ninewa. These projects should deliver potable water in December 2005. A 200 cubic-meter- per-hour potable water treatment plant with reverse smosis (a technique used to remove impurities from water) will supply potable water to 6,000people living in the Basrah area. The treatment plant is estimated to be completed in April 2006.

The estimated cost for the four water projects is $1.7 million. The awarding of these contracts is imminent and will provide jobs for local companies with the U.S. Army Corps of Engineers, Gulf Region Division. GRD will provide quality assurance oversight. The Ninewa projects will provide work for approximately 100 workers during the construction and for more than 30 workers for the projects’ maintenance and continued operation.

Construction of the Basrah treatment plant will employ about 20-25 workers and the operation of the plant will employ about 14 Iraqi workers. The Basrah work will also train local operators on site in the technology and maintenance of the compact unit.

Posted by Claire on 10/15 at 06:30 AM

Commenting is not available in this weblog entry.

<< Back to main

Ponderables




moon phases
 




Fighting Fusileers -- Donate ! !

image

Site Meter